Defining start time for sorting of operations
Introduction
Introduction
You can define the start time of the operations involved in
a production order. To do this, go to Manufacturing/Entries/Operations
control. Define the relevant criteria, and click Refresh. You will
see a list of production orders. Select the production order you want to
maintain and click the Sorting sequence button. By defining the start
time of operations, the operations will be sorted automatically according to
the defined start time within the same production order.
This functionality is enabled when you select the Operations
check box at System/General/Settings/Manufacturing settings, Operations section.
Description
Once the Sorting sequence button is clicked, the
following options are available:
Start date
This displays the start date of the operation in the
production order. This cannot be edited.
End date
This displays the end date of the operation in the
production order. This cannot be edited.
Start time
Type the start time of the operation involved in the
production order.
Buttons
OK
Click OK to save the defined start time for the
operation. This will automatically sort the operations within a production
order according to the defined start time.
Cancel
Click Cancel to not save the defined start time for
the operation.
Related documents
Main Category: |
Attachments & notes |
Document Type: |
Support - On-line help |
Category: |
|
Security level: |
All - 0 |
Sub category: |
|
Document ID: |
16.095.007 |
Assortment: |
Exact Globe+
|
Date: |
26-09-2022 |
Release: |
|
Attachment: |
|
Disclaimer |