Creating and maintaining production orders - Production order lines section - Operations tab
This screen is displayed when New or Open
is clicked at Manufacturing ➔ Entries ➔ Production orders.
Fields
This tab stores information about the operations required
for a BOM. Operations are groups of steps where people and materials are
handled according to operation instructions and drawing data. Each entry
represents an operation in producing the item while each operation determines
the sequence of steps to take in producing the end product. The default
operations are indicated in the BOM of the individual item. There are several
actions that can be performed with regards to the operations.
Note: This tab is enabled only if you select the Operations
check box in the Operations section under Manufacturing settings
at System ➔ General ➔ Settings.
Add
Click this to add a new operation.
Edit
Click this to edit the existing operation components.
Delete
Click this to remove the operation.
Recode
Click this to recode the operation step.
Operation
Click this to edit the existing operation properties.
Outsource
Click this to select items to be outsourced.
Operations control
Click this to maintain the operation status of the
production order. For more information, see Maintaining
operations control.
Note: This is enabled when the production order has
been released.
Buttons
You will see the following buttons when you click Add,
Edit, or when you double-click on an operation step.
Previous
Click this to see the previous operation step.
Next
Click this to see the next operation step.
Close
Click this to close.
Related documents
Main Category: |
Attachments & notes |
Document Type: |
Support - On-line help |
Category: |
|
Security level: |
All - 0 |
Sub category: |
|
Document ID: |
17.644.306 |
Assortment: |
Exact Globe+
|
Date: |
26-09-2022 |
Release: |
390 |
Attachment: |
|
Disclaimer |