Exact Synergy Enterprise login page à Shop floor control page
This page displays the details of the selected operations and steps. From this page, you can also perform actions like viewing details of the Bills of Materials (BOM) and routing of the operations, registering the time entries for your labor and machine hour items, and more.
To access this page, the Shop floor control role is required. In addition to that, a few requirements need to be met. For more information, see the Roles and rights section in Logging in to Shop Floor Control via Exact Synergy Enterprise.
Notes:
The information in this document is based on product update 252.
Keep in mind:
Click this to return to the listing of production orders with the steps that are executed on the selected operation. For more information, see Viewing overview of operations in touch screen user interface.
Click this to display the Time registration page, where you can register the time entries for labor and machine hour items that have to be realized for the step that is executed on the operation. For more information, see Registering time entries in touch screen user interface.
Note:
Click this to display details of the BOM that are linked to the particular step and operation selected. The details are similar to the details available under the BOM tab of the production order in Exact Globe Next. For more information, see Viewing Bills of Materials (BOM) information of operations in touch screen user interface.
Click this to display details of the routing of the operation selected. The details are similar to the details available under the Operations tab of the production order in Exact Globe Next. For more information, see Viewing routing information of steps and operations in touch screen user interface.
This displays the details of the customer that the production order is for.
This displays the description of the make item for the production order.
This displays the completed quantity of the make item over the planned quantity of the make item (defined in the header of the production order). The sales unit of the item will be displayed next to the values.
This displays the planned start date and time of the operation.
This displays the planned end date and time of the operation.
This displays the earliest start date and time of the operation. In cases where the operation is stopped and then restarted, the date and time displayed will not be changed. When the operation has not been started, "-" will be displayed.