How-to: Migrating Exact Lightweight Integration Server (ELIS) to another server
Introduction
In Exact Lightweight
Integration Server (ELIS), all
the setup and configurations are performed in the ELIS database. ELIS can
be migrated to different servers based on the following two approaches:
New ELIS server with a new ELIS database
-
Deactivate the configurations in ELIS on the existing server.
-
Remove the configurations in ELIS on the existing server.
-
Delete the endpoints in ELIS on the existing server.
-
Back up the ELIS
database, and remove the database from the SQL server.
-
Install ELIS
on the other server using the new ELIS
database.
-
Set up the endpoints.
-
Set up the solutions that you want to use.
-
Use the ELIS
Migration tool to fill in the keylookup data for the integrator.
New ELIS server with an existing (backup) ELIS database
-
Back up the ELIS
database from ELIS.
-
Install ELIS
on the new server, and restore the existing ELIS database from step 1.
Note:
At this point, the clients (Exact Synergy Enterprise and Exact Globe Next) would
have already lost the connection to the ELIS
server. All the synchronization will not work.
-
Run the Repair
Tool to restore the connection between the new ELIS and the clients. This will also help to restore the existing
activations.
-
Go to the ELIS
endpoint screen, and click Connect
to verify the connection between ELIS
and the clients. “Connected” should be displayed.
-
Use the ELIS
Migration tool to fill in the keylookup again for the integrator.
Related document
Main Category: |
Support Product Know How |
Document Type: |
Online help main |
Category: |
On-line help files |
Security level: |
All - 0 |
Sub category: |
Details |
Document ID: |
28.630.465 |
Assortment: |
Exact Synergy Enterprise
|
Date: |
14-08-2018 |
Release: |
|
Attachment: |
|
Disclaimer |