|
Connectivity Manual - Hour entries
File name: prhentry.csv
1 |
adm_nr |
INT |
N6 |
B |
admdat |
Company number |
Mandatory |
- |
2 |
line_nr |
INT |
N4 |
B |
- |
Line number |
0 for header |
- |
3 |
entry_nr |
INT |
N8 |
H |
- |
Entry number |
- |
?= first available |
4 |
employee_code |
CHAR |
A8 |
H |
premp |
Employee |
Mandatory |
- |
5 |
check_total |
DEC |
N9,2 |
H |
- |
Check total |
- |
- |
6 |
result_type |
INT |
N6 |
H |
- |
Result type |
400501/400502 |
400501 |
7 |
input_type |
INT |
N6 |
H |
- |
Input type |
Mandatory
400401/400402
|
- |
8 |
description |
CHAR |
A30 |
B |
- |
Description |
- |
- |
9 |
date |
DATE |
DD/MM/YYYY |
S |
- |
Date |
- |
?=system date |
10 |
project_code |
CHAR |
A10 |
S |
prmst |
Project code |
Mandatory |
- |
11 |
qty |
DEC |
N9,2 |
S |
- |
Quantity |
- |
- |
12 |
hour_cat_code |
CHAR |
A8 |
S |
prhcat |
Hour category |
- |
- |
13 |
seqnr_practv |
INT |
N5 |
S |
practv |
Activity |
- |
- |
14 |
cost_center |
CHAR |
A8 |
S |
ccent |
Cost center |
Mandatory |
* |
15 |
cost_unit |
CHAR |
A8 |
S |
cunit |
Cost unit |
- |
* |
Clarification of the fields:
5 |
The use of this field depends on the project settings. In the settings you can define whether you want to be able to check the total. When you set this option to mandatory, this field has to be filled. You can also enter a '?' to use the default value. |
6 |
For costs enter 400501, for revenues enter 400502. If this field is left empty, costs (400501) will be used as default. |
7 |
You should enter 400401 for standard entries and 400402 for schedule entries. |
9 |
When entering a '?', the current date will be used. |
12 |
Only used when an entry is made for Employee schedule expenses. In that case this field replaces the field 'Hour category'. |
14 |
If in your settings you have defined in you settings that you want to be able to change the cost center when making an entry, then every cost center can be entered here. If you stated that changing the cost center is not allowed, you will have to use the cost center you defined on the project master card. A '?' can be used to use the default value of the project master card. |
15 |
The cost unit of the project master card should be entered here. If you enter a '?', Exact Financials will retrieve this cost unit automatically. |
Connectivity > Data import > Available import formats > Project > Hour entries
Main Category: |
Support Product Know How |
Document Type: |
Support - On-line help |
Category: |
On-line help files |
Security level: |
All - 0 |
Sub category: |
Details |
Document ID: |
18.325.037 |
Assortment: |
Exact Financials
|
Date: |
03-10-2015 |
Release: |
|
Attachment: |
|
Disclaimer |
|
|