On this page, you can define the quantity completed for the step that is executed on the operation. You can only fill in the quantity completed for production orders with at least the Released status, and for operations with the Open or Started status.
By-product items can also be registered via the By-products button on this page. By product items are secondary products derived from a production process and are considered to yield smaller revenues compared to the primary product or service being produced.
In addition, you can stop the time entries that you have started or complete the operation step, as well as view the statuses of the hour realizations for all operations.
Roles and rights
To access this page, the Shop floor control role is required. In addition to that, a few requirements need to be met. For more information, see the Roles and rights section in Logging in to Shop Floor Control via Exact Synergy Enterprise.
Notes:
- For more details on function rights, go to System à Setup à Security à Function rights.
- For more details on roles, go to System à Setup à Security à Roles.
What version are you using?
The information in this document is based on product update 252.
How do I define the quantity completed for the operations?
- Select the SFC Interface check box.
- At Operation, select an operation.
- Click Login. Once you have logged in, the production orders with the steps that will be executed on the selected operation will be displayed.
- Click on a row to view the details of the corresponding operation. The Operation details page will be displayed.
- Click Next. The Time registration page will be displayed.
- Click Next. The Issue materials page will be displayed.
- Click Save + Next. The Quantity complete page will be displayed.
- Type a number at Quantity completed.
- Click any of the buttons to save the quantity defined.
Keep in mind:
- When there are no labor or machine hour items to be realized, after clicking Next at step 5, the Issue materials page will be displayed.
- When there are no labor or machine hour items to be realized and no materials to be issued, after clicking Next at step 5, the Quantity complete page will be displayed.
- When there are no labor or machine hour items to be realized, no available materials to be issued, and the operation is the last operation in the production order, after clicking Next at step 5, the Production receipt page will be displayed.
- When there are no materials to be issued, after clicking Next at step 6, the Quantity complete page will be displayed.
- When there are no materials to be issued and the operation is the last operation in the production order, after clicking Next at step 6, the Production receipt page will be displayed.
How do I view the overview of time registration?
- Select the SFC Interface check box.
- At Operation, select an operation.
- Click Login. Once you have logged in, the production orders with the steps that will be executed on the selected operation will be displayed.
- Click on a row to view the details of the corresponding operation. The Operation details page will be displayed.
- Click Next. The Time registration page will be displayed.
- Click Next. The Issue materials page will be displayed.
- Click Save + Next. The Quantity complete page will be displayed.
- Click Registration overview. The Time registration overview page will be displayed.
- Click Collapse/Expand to expand the Criteria section.
- In the Criteria section, define the requierd criteria, and then click Refresh.
How do I register by-product items?
- Select the SFC Interface check box.
- At Operation, select an operation.
- Click Login. Once you have logged in, the production orders with the steps that will be executed on the selected operation will be displayed.
- Click on a row to view the details of the corresponding operation. The Operation details page will be displayed.
- Click Next. The Time registration page will be displayed.
- Click Next. The Issue materials page will be displayed.
- Click Save + Next. The Quantity complete page will be displayed.
- Click By-products. The By-product page will be displayed.
- Fill in the required information, and then click Save + Back or Save + Next.
Keep in mind:
- When there are no labor or machine hour items to be realized, after clicking Next at step 5, the Issue materials page will be displayed.
- When there are no labor or machine hour items to be realized, no available materials to be issued, and the operation is not the last operation in the production order, after clicking Next at step 5, the Quantity complete page will be displayed.
- When there are no materials to be issued and the operation is not the last operation in the production order, after clicking Next at step 6, the Quantity complete page will be displayed.
- The By-products button is available only if the By-products check box under the Button section on the Customise: Operation overview page has been selected. For more information, see Customizing Operation overview page in touch screen user interface.
How do I stop all time entries of the operation step?
- Select the SFC Interface check box.
- At Operation, select an operation.
- Click Login. Once you have logged in, the production orders with the steps that will be executed on the selected operation will be displayed.
- Click on a row to view the details of the corresponding operation. The Operation details page will be displayed.
- Click Next. The Time registration page will be displayed.
- Click Next. The Issue materials page will be displayed.
- Click Save + Next. The Quantity complete page will be displayed.
- Click Stop hours to stop the time entries of the operation step.
Keep in mind:
- At step 8, only time entries that have been started by the user currently logged in to SFC will be stopped.
- When there are no labor or machine hour items to be realized, after clicking Next at step 5, the Issue materials page will be displayed.
- When there are no labor or machine hour items to be realized and no materials to be issued, after clicking Next at step 5, the Quantity complete page will be displayed.
- When there are no labor or machine hour items to be realized, no available materials to be issued, and the operation is the last operation in the production order, after clicking Next at step 5, the Production receipt page will be displayed.
- When there are no materials to be issued, after clicking Next at step 6, the Quantity complete page will be displayed.
- When there are no materials to be issued and the operation is the last operation in the production order, after clicking Next at step 6, the Production receipt page will be displayed.
How do I complete an operation step?
- Select the SFC Interface check box.
- At Operation, select an operation.
- Click Login. Once you have logged in, the production orders with the steps that will be executed on the selected operation will be displayed.
- Click on a row to view the details of the corresponding operation. The Operation details page will be displayed.
- Click Next. The Time registration page will be displayed.
- Click Next. The Issue materials page will be displayed.
- Click Save + Next. The Quantity complete page will be displayed.
- Click Complete operation to stop all time entries and set the status of the operation step to Completed.
Keep in mind:
- At step 8, all time entries that have been started will be stopped.
- When there are no labor or machine hour items to be realized, after clicking Next at step 5, the Issue materials page will be displayed.
- When there are no labor or machine hour items to be realized and no materials to be issued, after clicking Next at step 5, the Quantity complete page will be displayed.
- When there are no labor or machine hour items to be realized, no available materials to be issued, and the operation is the last operation in the production order, after clicking Next at step 5, the Production receipt page will be displayed.
- When there are no materials to be issued, after clicking Next at step 6, the Quantity complete page will be displayed.
- When there are no materials to be issued and the operation is the last operation in the production order, after clicking Next at step 6, the Production receipt page will be displayed.
Tips and tricks
The following table lists a couple of scenarios that could occur and how the system handles these scenarios:
No |
Scenario |
Explanation |
1 |
Click the Stop hours button, but no time entries have been started. |
No updates will be done. The Operation overview page is displayed. |
2 |
The Check stock check box at System à General à Settings, under the Order settings has been selected. You click the Complete operation button and the backflush action is triggered, but there is insufficient stock. |
The incident will be logged.
The status of operation will be changed to Completed.
Backflush will not be performed on any hour or material line. |
Buttons
Save + Back
Click this to save the information defined and to return to the previous page.
Registration overview
Click this to view the statuses of the hour realizations for all operations. For more information, see Viewing overview of time registration in touch screen user interface.
By-products
Click this to register by-product items. For more information, see Registering by-product items in touch screen user interface.
Stop hours
Click this to save the information defined and to stop all the time entries (for both labor and machine hours) of the operation step that have been started. The time entries that will be stopped are the time entries that have been started by the person who is currently logged in to SFC.
Note: If no hours have been started, clicking this will save the value defined at Quantity completed, and you will then be directed to the Operation overview page. This does not complete the operation.
Complete operation
Click this to stop all time entries (including time entries started by other people) and set the status of the operation step to Completed.
Note: When you click this button, backflush will be performed on all hour and material lines of this operation that is linked to a production order that has at least, been printed. Also, you will be directed to the Operation overview page.
Fields
Quantity completed
Type a numeric value to define the quantity completed of the step that is executed on the operation. The sales unit of the item will be displayed next to the value.
Note:
- If the status of the operation is Open, it will automatically be changed to Started once you have defined a value greater than zero and saved the information by clicking any of the buttons.
- The value at this field will always be displayed as zero. When you have filled in a value, for example “2”, and clicked on any of the buttons, the value will be saved. When you return to this page, the value will again be displayed as zero. If you fill in another value at this field, for example “4”, and clicked on any of the buttons, the quantity completed value will then be 6 (2 + 4).
- If you define the quantity completed for an operation that has already been completed, no error will be displayed on this page. However, an error will be logged in the system for the back-office user to rectify it.
Completed / Planned
The Completed field displays the completed quantity of the selected operation and the Planned field displays the planned quantity defined in the header of the production order. The sales unit of the item will be displayed next to the values.
Related documents
Main Category: |
Support Product Know How |
Document Type: |
Online help main |
Category: |
On-line help files |
Security level: |
All - 0 |
Sub category: |
Details |
Document ID: |
24.021.308 |
Assortment: |
Exact Synergy Enterprise
|
Date: |
21-02-2014 |
Release: |
251 |
Attachment: |
|
Disclaimer |
|
|