Project rates are project-specific and only available for the selected project. On this page, you can create, view and maintain the project rates linked to the project.
To view project rates:
To create and modify project rates:
Note:
The information in this document is applicable to product update 260 and higher. If you have versions lower than this, certain features explained here will not be applicable.
Keep in mind: All fields with the “!” icon are mandatory.
Click this to exit.
Click this to save the details of the project rate.
Click this to delete the project rate.
Note: This is available only if you are modifying a project rate.
Select Activity to create a project rate for an activity or Material to create a project rate for a material.
Note: This option is disabled in the edit mode.
Type or select the person linked to the project rate.
Type or select an activity to be linked to the project rate.
Note: This field will be displayed only if the Activity option is selected.
Type or select a material to be linked to the project rate.
Note: This field will be displayed only if the Material option is selected. This is mandatory.
Type or select a date range for the project rate. This is mandatory.
Select this option to define the sales price for the project rate. Type or select the currency to be used for the sales price. In the next box, type a value to define the sales price for the project rate.
Note: If there is no value defined at this field, then the default value will be "0.0000".
Besides defining the sales price, you can also define either one of the following options:
Markup % — Select this option to define the sales price based on the markup percentage of the cost price. Type a value to define the markup percentage for the project rate.
Note: This field accepts values ranging from “-999.99” to “999.99”. If this option is selected, then the value at the Sales price field, if any, will be changed to "0.0000".
Select this option to define the cost price for the project rate. The currency to be used for the cost price is based on the currency defined for the division to which the project belongs, and cannot be changed here. In the next box, type a value to define the cost price for the project rate.
Besides defining the cost price, you can also define the following option: