On this page, you can create and modify work breakdown structure (WBS) lines for deliverables.
To manage deliverables and work breakdown structure (WBS), function right 903 — Manage deliverable/WBS is required. By default, users with the Project planner or Project administration role have this function right.
Note:
The information in this document is applicable to product update 260 and higher. If you have versions lower than this, certain features explained here will not be applicable.
Keep in mind: All fields with the “!” icon are mandatory.
Keep in mind: Only WBS lines without linked requests can be deleted. The Delete button will only be enabled for WBS lines without linked requests.
Click this to exit.
Click this to save the settings.
Click this to save the settings and create another WBS line.
Note: This is available only when you are creating WBS lines.
Click this to delete the WBS line.
Note: This is available only when you are modifying WBS line.
Select Activity to create a WBS line for an activity or Material to create a WBS line for a material.
Note: This option is disabled in the edit mode.
This displays the code and description of the related deliverable. It cannot be edited.
Type or select an activity to be linked to the WBS line.
Note: This field will be displayed only if the Activity option is selected. This is mandatory when creating a WBS line for an activity and cannot be edited once the WBS line is saved.
Type or select an item to be linked to the WBS line.
Note: This field will be displayed only if the Material option is selected. This is mandatory when creating a WBS line for a material and cannot be edited once the WBS line is saved.
Type a short description for the WBS line. This is mandatory.
By default, the date range for the WBS line follows the date range of the deliverable displayed at the Deliverable field. The date range can be changed as long as the range is within the date range of the deliverable.
Note: These fields are not available if the Use gauges to display percentage of completion check box under the Other settings section at Modules ? Projects ? Setup ? Professional services automation ? Settings is selected. If the check box is selected, the start and end dates will be displayed in the tooltip, which is displayed when you mouse over the progress bars located under the Estimations section.
Select this check box to enable the WBS line to be flagged as purchasing.
Type an estimated duration of the WBS line created for the activity.
Type an estimated quantity of the WBS line created for the material.
This displays the current estimated duration of the WBS line for the activity.
Note: This is displayed only if the Activity option is selected and after the WBS line for an activity has been saved. This is not enabled. When editing the WBS line for the first time, this value will follow the value at Estimated duration (initial). Thereafter, the value is calculated by adding the Actual value and the value defined at Estimate to complete.
This displays the current estimated quantity of the WBS line for the material.
Note: This is displayed only if the Material option is selected and after the WBS line for a material has been saved. This field is not enabled. When editing the WBS line for the first time, this value will follow the value at Estimated quantity (initial). Thereafter, the value is calculated by adding the Actual value and the value defined at Estimate to complete.
The first progress bar represents the Invoiced, Actual, Submitted, and Planned values. Mouse over the bar to display a tooltip, which shows the start and end dates of the WBS line, as well as the Invoiced, Actual, Submitted, and Planned values. The second progress bar represents the Estimated (initial) and Estimated (current) values. Mouse over the bar to display a tooltip, which shows the start and end dates of the WBS line, as well as the Estimated (initial) and Estimated (current) values.
Note: This is displayed only if the Use gauges to display percentage of completion check box under the Other settings section at Modules ? Projects ? Setup ? Professional services automation ? Settings is selected.
This displays the percentage of completion of the WBS line for the activity or material.
Note: This is displayed after the WBS line for an activity or a material has been saved. This is not enabled. This value is calculated by dividing the Actual value with the value at Estimated duration (current) or Estimated quantity (current).
Type an estimated duration or quantity to be completed of the WBS line created for an activity or a material respectively.
Note: This is displayed after the WBS line for an activity or a material has been saved. When the value is changed, the values at Estimated duration (current) or Estimated quantity (current), and Percentage of completion will automatically be updated. The work on the WBS line is completed when the value at this field is zero. The value at Estimated duration (current) or Estimated quantity (current) will then be automatically changed to follow the Actual value.
This section displays financial information related to the WBS line. The information cannot be edited.
This displays the rate for the selected activity or item. Mouse over the icon to display a tooltip with additional information. You can click the icon to display the Item page. When the cost rate is the same as the sales price, only the sales price will be displayed.
This displays the total actual duration or amount defined in requests linked to the WBS line and the total sales price calculated for the WBS line.
Select this check box to enable the Total cost/sales price field.
This displays the total budgeted amount for the selected activity.
Note: This field is displayed only if the Activity option is selected.
This displays the total budgeted amount for the selected material.
Note: This field is displayed only if the Material option is selected.
This displays the total hours used in the WBS line for the selected activity.
This displays the total hours used in the WBS line for the selected material.